江苏恒信
英文版 中文版
 

P & I survey

     

Pre-Loading Survey、Dispose quantity shortage and quality disqualification , Loss Adjusting & Prevention

      1 Draft Survey 

      2 Hold Cleanliness Inspection

      3 Dry Tank inspection

      4 Sampling and seal

      5 Lab Witness

      6 Wall wash test

      7 Pre-loading Inspection at Storage

      8 photographic record